[vsnet-grb-info 24622] LIGO/Virgo S200112r: INTEGRAL was inactive at the time of the event
GCN Circulars
gcncirc at capella2.gsfc.nasa.gov
Mon Jan 13 03:11:31 JST 2020
TITLE: GCN CIRCULAR
NUMBER: 26721
SUBJECT: LIGO/Virgo S200112r: INTEGRAL was inactive at the time of the event
DATE: 20/01/12 18:09:26 GMT
FROM: Alexis Coleiro at APC/U. Paris Diderot <coleiro at apc.in2p3.fr>
Alexis Coleiro (APC, France), Carlo Ferrigno (ISDC/UniGE, Switzerland),
V. Savchenko (ISDC/UniGE, Switzerland),
S. Mereghetti (INAF IASF-Milano, Italy),
J. Rodi (IAPS-Roma, Italy)
on behalf of the INTEGRAL multi-messenger collaboration:
https://www.astro.unige.ch/cdci/integral-multimessenger-collaboration
The INTEGRAL spacecraft has a highly elliptical orbit and the
instruments are not acquiring science data during perigee passage,
every 2.6 days to prevent radiation-induced damages. Unfortunately, at
the time of the S200112r (2020-01-12 15:58:38) the spacecraft was
preparing to the start the observations after the perigee passage
between the orbits number 2182 and 2183 and no scientific instrument
data are available between 2020-01-12T08:15:40 and
2020-01-12T18:14:13.
More information about the vsnet-grb-info
mailing list