[vsnet-grb 27130] Recent and Future GCN outages

Bacodine vxw at capella.gsfc.nasa.gov
Sat Jul 22 04:15:04 JST 2006


TO:  All GCN Notice recipient sites                    21 Jul 06
RE:  GCN Website offline this weekend

A few statements about GCN Operations (recent and future):

1) GCN will be off-line tomorrow/Saturday (22 Jul 06)
starting 14:00 UT and lasting possibly as long as 22:00 UT.
The Goddard-wide Network is being upgraded.
This will disable all GCN Notices and Circulars.
There is a chance that there will also be an outage
1 week later (Sat, 29 Jul 06).

2) The recent security problems in Building 2 of Goddard
(where the GCN machine is located) have been 99% solved.
There were some brief outages (see the 15jul06 announcement below).
I have had to do some scrambling to keep up with the many changes
the IT Network/Security people have implemented,
but I think everything is back to normal operations for GCN.

3) One additional outcome of the security problems and port closures
was the loss of the NTP Time Server.  As such, the GCN computer
stopped receiving time updates and this resulted in the some strange values
in the NOTICE_DATE timestamps in the outgoing email Notices
for GRBs 060717 and 060719 (~5 and ~25 sec ahead of the GRB_DATE, resp).
Please note that this drifting time affected ONLY the NOTICE_DATE;
not the GRB_DATE (which comes from the various spacecraft).
The time server is now back in operation.


> The computer network in the building 2 here at Goddard
> in which GCN resides suffered a security breach.
> Part of the initial response to that breach was to install
> firewall blocks on all incoming/outgoing traffic
> with the exception for some holes for the GCN socket sites and
> for email.  But everything else is blocked.  As such, you will not
> be able to get to the GCN website this weekend.
> 
> I expect this blockage to be lifted early this week (Monday?),
> but I will not know more until the network/admin people start 
> working the problem again on Monday.
> 
> There were two brief socket outages (a 23-min outage starting
> at 22:37 UT 14jul06 and a 33-min outage starting 14:11 UT 15jul06)
> when the firewall blocks were installed and a further adjustment.
> These were brief and no bursts happened during these outages.
> 
> Again, all the Notices and Circulars functionality of GCN is 
> still working -- only the website is off-line.

Sincerely,
Scott

Scott Barthelmy                      NASA-GSFC, Code 661, Greenbelt, MD   20771
PHONE:  301-286-3106                 (office)
PHONE:  301-346-3733                 (cell)
FAX:    301-286-1684                 (1st choice,  -1682 2nd choice)
EMAIL:  scott at lheamail.gsfc.nasa.gov
PAGER:  3013463733 at mmode.com
WEB:    http://gcn.gsfc.nasa.gov/gcn


///////////////////////////////////// site's configuration /////////////////////////////////
 

Site_name: VSNET
Lon,Lat=  135.75   35.00
Distribution_method: EMAIL  Attachment_format: NONE
Address: vsnet-grb at kusastro.kyoto-u.ac.jp   
Filter:  ALL
Error_limit=   360.100 [deg, diameter]
Delta_T_limit= 999.900 [hr]
Swift_Trigger_ID_filter:   Disabled
Sources & Notice Types/Subtypes:
    RXTE-PCA_Alert_wont:      Enabled
    RXTE-PCA_Alert_will:      Enabled
    RXTE-PCA_nosaw:           Enabled
    RXTE-PCA_saw:             Enabled
    RXTE-ASM:                 Enabled
    IPN_POS:                  Enabled
    ALEXIS:                   Enabled
    RXTE-ASM_TRANS:           Enabled
    HETE_S/C_ALERT:           Enabled
    HETE_S/C_UPDATE:          Enabled
    HETE_S/C_LAST:            Enabled
    HETE_GND_ANA:             Enabled
    HETE_Test_notices:        Disabled
    Test_type2_notices:       Disabled
    INTEGRAL_Test_notices:    Disabled
    SWIFT_Test_notices:       Disabled
    INTEGRAL_POINTDIR:        Disabled
    INTEGRAL_SPIACS:          Enabled
    INTEGRAL_WAKEUP:          Enabled
    INTEGRAL_REFINED:         Enabled
    INTEGRAL_OFFLINE:         Enabled
    MILAGRO_POS:              Disabled
    SWIFT_BAT_GRB_ALERT:      enabled
    SWIFT_BAT_GRB_POS:        enabled
    SWIFT_BAT_GRB_POS_NACK:   enabled
    SWIFT_BAT_GRB_LIGHTCURVE: enabled
    SWIFT_FOM_2OBS:           enabled
    SWIFT_SC_2SLEW:           enabled
    SWIFT_XRT_POS:            enabled
    SWIFT_XRT_POS_NACK:       enabled
    SWIFT_XRT_SPECTRUM:       enabled
    SWIFT_XRT_IMAGE:          enabled
    SWIFT_XRT_LIGHTCURVE:     enabled
    SWIFT_UVOT_IMAGE:         enabled
    SWIFT_UVOT_SRCLIST:       enabled
    SWIFT_UVOT_POS:           enabled
    SWIFT_UVOT_POS_NACK:      Disabled
    SWIFT_BAT_GRB_LC_PROC:    enabled
    SWIFT_XRT_SPECTRUM_PROC:  enabled
    SWIFT_XRT_IMAGE_PROC:     enabled
    SWIFT_UVOT_IMAGE_PROC:    enabled
    SWIFT_UVOT_SRCLIST_PROC:  enabled
    SWIFT_FULL_DATA_INIT:     enabled
    SWIFT_FULL_DATA_UPDATE:   enabled
    SWIFT_POINTDIR:           enabled
    SWIFT_BAT_TRANS:          Disabled


When requesting changes to your configuration,
it helps if you refer to your site_name.



More information about the vsnet-grb mailing list